9000kVA 10/0.66kV Oil Immersed Transformer Set For Delivery

Sep 11, 2025

Mesaj bırakın

Large Capacity Oil filled Transformer Shipment
 
 

With the arrival of the peak season, VKE Power has seen a substantial increase in orders for large-capacity transformers. Among them, the first batch of eight units has passed all testing and is ready for shipment to the customer's project site.

 

 

 

S22-3150/10/0.4 10±2×2.5%/0.4 Dyn11

1

ZSS-6500/10/0.69 10±2×2.5%/0.69 Dd0

2

ZSSF-9000/10/0.66 10±2×2.5%/0.66 Dd0-Dy11

1

ZSS-2500/10/0.4 10±2×2.5%/0.4 Dy11

1

ZSS-2500/10/0.4 10±2×2.5%/0.4 Dd0

1

ZSS-6500/10/0.69 10±2×2.5%/0.69 Dy11

2
 

 
Core

We use cold-rolled silicon steel sheets as the material to reduce no-load losses.

Winding

We utilize oxygen-free copper wires to ensure electrical efficiency and mechanical strength.

Insulating Oil

We use mineral oil per the customer's specification.

Radiator

These large-capacity transformers are equipped with corrugated radiators to regulate temperature.

Oil Tank

The structure adopts corrugated plates to adapt to the change of oil volume with temperature and reduce the impact of the external environment on the insulating oil.

Protective Device

Protective devices such as pressure relief valve and gas relay can trigger alarms or trips in cases of overload or short circuit.

 

 

 

 

The energy efficiency levels are divided into three grades. Among them, level 1 products have the lowest no-load losses and load losses, but their procurement cost is higher. cover all efficiency grades. Customers can select the model that meets their power needs and budget.

2500kVA Oil Immersed Transformer

 

 

 

 

 

3150kVA Oil Transformer

Oil immersed transformers must meet fire and explosion prevention standards. VKE's oil tanks have passed rigorous sealing testing and incorporate flame-retardant materials to mitigate fire risks. For specialized environments such as high humidity or corrosive gas areas, protective enclosures will be added, or anti-corrosion treatment will be carried out.

 

 

 

Attention must be paid to foundation load-bearing, ventilation conditions, and fire safety requirements.

 

 

Regular checks of oil level, oil temperature, bushing cleanliness, and the condition of the grounding system.

 

 

If oil chromatographic analysis indicates abnormalities or there is localized overheating, internal faults should be investigated promptly.